News

04May 2018

Yaskawa servo drive common fault code A.00 Absolute data error Abnormal data cannot be accepted or Absolute data accepted Abnormal A.02 Parameter destruction The “sum check” result of the user constant is abnormal A.04 User Constant Setting Error The set “user constant” exceeds the setting range A.10 Current is too high Power transistor current is […]

24May 2018

The following conditions may cause the photoelectric sensor to detect that the output signal is unstable: 1 The power supply is abnormal; 2 detection frequency is too fast; 3 measured object size problem; 4 The measured object is not in the sensor stability detection area; 5 electrical interference. Countermeasures: 1 to the sensor for a […]

15Jul 2018

Due to the complicated programming of the CNC lathe, in order to make the programmed program interchangeable for the same type of machine tool, it also makes the programming simple, the name of the axis and the positive and negative direction of its motion. The International Organization for Standardization has unified the standard coordinate system. […]

06Aug 2018

•Sensitivity: The thermistor can change with very small temperature changes. Accuracy: Thermistors provide high absolute accuracy and error. Cost: For the high performance of the thermistor, its cost performance is very high. • Robustness: The construction of the thermistor makes it extremely rugged. • Flexibility: Thermistors can be configured in a variety of physical forms, […]

31Aug 2018

Pneumatic complete sets of valves are field instruments and should be regularly maintained and maintained. It is clean and tidy all year round, with good lubrication and complete accessories. It is the guarantee for the normal operation of pneumatic valve products. For routine maintenance of pneumatic actuators, the air source should be kept dry and […]

28Sep 2018

(1) Contents of equipment use procedures: 1. Equipment technical performance and allowable limit parameters, such as maximum load, pressure, temperature, voltage, current, etc.; 2. The requirements for equipment handover, two or three shifts of continuous operation equipment, the post personnel must hand over the equipment operation status, including: abnormal operation of the equipment, changes in […]